Storing – NDIX (25/03/2011)

 

Starttijd: 25-03-2011 08:00
Eindtijd: Onbekend
Status:

 

Probleem:
Door een storing in het knooppunt Zwolle en Enschede van NDIX is het voor klanten niet mogelijk verbinding te krijgen met het internet. Het gaat hierbij om Ethernet VLAN verbindingen. NDIX is op de hoogte en werkt spoedig aan een oplossing. 

 

= Actueel – = Niet actueel / Verholpen

25 mrt

Power Maintenance [Update]

Startdate: March 24th 2011 10:00:00(CEST)
Enddate: March 24th 2011 10:15:00(CEST)

Dear customer,



On the 24th of march at 10:00 am CET, we will be performing a power maintenance.

This has to be done to guarantee the uptime and service you expect from us. The power maintenance which Evoswitch is having is done and therefor your server need to get back on the right feed again.



We anticipate that this work will take no more than 15 minutes to complete, and will commence at 10:00 am CET . At the very worst case, this work should be totally completed by 1 hour.



The following ip ranges will be unavailable during this window:

85.17.29.64/27

85.17.29.224/27

85.17.31.128/27



During this maintenance, your server has to be powered off. Please shutdown your server a few minutes before the indicated start time. Leaseweb will power your server on after the maintenance. If your server is still powered, Leaseweb shall power it off.



All times are Central European Time (UTC + 1 hour).



If you have any questions regarding this maintenance, please let us know by replying to [email protected]



Kind regards,

Leaseweb Support





[ Update ]



The maintenance affects only the following ip ranges;



85.17.29.64/27

85.17.29.224/27

85.17.31.128/27





Kind regards,

Leaseweb Support



[ Update ]



The maintenance was a success. If you encounter problems regarding this maintenance, please let us know by replying to [email protected]



Kind regards,

Leaseweb Support

25 mrt

Emergency core router maintenance

Startdate: March 23rd 2011 06:30:00(CEST)
Enddate: March 23rd 2011 07:30:00(CEST)

Dear Customer,



The software upgrade of our core router at Telecity-2 this morning has introduced an issue with the CPU load on the router.

During this maintenance window we will restart software processes to try and resolve the problem.



If we are not able to resolve the issue with these actions we will upgrade to a different release of Junos.



These steps will incur two or three 5 minute interruptions of routing traffic.

The traffic will be rerouted through or other core router located at Evoswitch.



Kind regards,



Leaseweb NOC

25 mrt

Telecity2 core router software upgrade [Update]

Startdate: March 22nd 2011 06:30:00(CEST)
Enddate: March 22nd 2011 07:30:00(CEST)

Dear customer,

We are going to upgrade the software on our core router at Telecity 2 in Amsterdam. Thanks to redundant routing engines and nonstop routing technology the upgrade should be really smooth, but just in case we will reroute our traffic to the core router at Evoswitch during the maintenance. No impact is expected.

The maintenance will take place between 6:30 and 7:30 CET (UTC+1) on the 22nd of March 2011.

Kind regards,

Leaseweb NOC

[UPDATE 07:01]

The software upgrade was competed successfully.

25 mrt

[20100316] High volume router maintenance

Startdate: March 17th 2011 07:00:00(CEST)
Enddate: March 17th 2011 08:30:00(CEST)

Dear Customer,



We are upgrading our new High volume platform and therefore we need to migrate some uplinks. During this maintenance customers may see a slight downtime during the reconnection.



The affected prefixes are:

85.17.24.0/21

212.7.212.0/24

82.192.94.0/23



Our apologies for any inconvenience caused by this maintenance.



Kind regards,



LeaseWeb – NOC

25 mrt

Onderhoud aan brandmeldinstallatie BIT-1

Op maandag 4 april a.s. zal de leverancier van onze brandmeldinstallatie op BIT-1 tussen 8.30 en 17.30 uur onderhoud uitvoeren. Tijdens dit onderhoud zal de automatische aansturing van de blusinstallatie uitgeschakeld zijn, mocht er door de brandmeldinstallatie brand gedetecteerd worden zal het aanwezige personeel handmatig de blussing activeren.

Het gehele onderhoud zal begeleid worden door engineers van BIT.

Mocht u vragen of opmerkingen hebben naar aanleiding van dit onderhoud, dan kunt u contact opnemen met de afdeling Customer Care via 0318 648 688 of via [email protected].

24 mrt

Glasvezel storing Rotterdam

At this moment we experience an outage on the following location(s):

Affected location(s) : Rotterdam Nesselande / RT-NSL
Network component(s) affected : RT-NSL-CORE01
RT-NSL-A-ACCS01
RT-NSL-B-ACCS01
RT-NSL-C-ACCS01
RT-NSL-E-ACCS01
RT-NSL-F-ACCS01
RT-NSL-G-ACCS01
RT-NSL-H-ACCS01

Impact : Total outage for all connections
TT Number : CC0000000337095
Start time of outage : 11:47

Outage reason : Under investigation

We apologize for the inconvenience.